Skip to main navigation Skip to search Skip to main content

A mathematical framework for delay analysis in single source networks

  • University of California
  • University of California, Berkeley
  • University of California

Research output: Chapter in Book/Report/Conference proceedingConference contributionpeer-review

1 Citation (Scopus)

Abstract

This article presents a mathematical framework for modeling heterogeneous flow networks with a single source and multiple sinks. The traffic is differentiated by its destination (i.e. Lagrangian flow) and different flow groups are assumed to satisfy the first-in-first-out (FIFO) condition at each junction. We show that our model leads to a well-posed problem for computing the dynamics of the system and prove that the solution is unique through a mathematical derivation of the model properties. The framework is then used to analytically prescribe the delays at each junction of the network and across any sub-path, which is one of the contributions of the article. This is a critical requirement when solving control and optimization problems over the network, such as system optimal network routing and solving for equilibrium behavior. In fact, the framework provides analytical expressions for the delay at any node or sub-path as a function of the inflow at any upstream node. Furthermore, the model can be solved numerically using a very simple and efficient feed forward algorithm. We demonstrate the versatility of the framework by applying it to a diverge junction with complex junction dynamics.

Original languageEnglish
Title of host publicationACC 2015 - 2015 American Control Conference
PublisherInstitute of Electrical and Electronics Engineers Inc.
Pages4603-4609
Number of pages7
ISBN (Electronic)9781479986842
DOIs
Publication statusPublished - 28 Jul 2015
Event2015 American Control Conference, ACC 2015 - Chicago, United States
Duration: 1 Jul 20153 Jul 2015

Publication series

NameProceedings of the American Control Conference
Volume2015-July
ISSN (Print)0743-1619

Conference

Conference2015 American Control Conference, ACC 2015
Country/TerritoryUnited States
CityChicago
Period1/07/153/07/15

Fingerprint

Dive into the research topics of 'A mathematical framework for delay analysis in single source networks'. Together they form a unique fingerprint.

Cite this