Abstract
In this paper, we study a single-reservoir Hydro Unit Commitment Problem in a deterministic price-taker context, where production is assumed to be generated through discrete operational points. Under some hypotheses, we present a time expanded graph representation for the problem, where, at each time step, nodes correspond to the discrete operational points, and arcs refer to possible state changes. Based on the graph representation, we show that our problem reduces to a Constrained Shortest Path Problem.
| Original language | English |
|---|---|
| Pages | 139-142 |
| Number of pages | 4 |
| Publication status | Published - 1 Jan 2020 |
| Event | 15th Cologne-Twente Workshop on Graphs and Combinatorial Optimization, CTW 2017 - Cologne, Germany Duration: 6 Jun 2017 → 8 Jun 2017 |
Conference
| Conference | 15th Cologne-Twente Workshop on Graphs and Combinatorial Optimization, CTW 2017 |
|---|---|
| Country/Territory | Germany |
| City | Cologne |
| Period | 6/06/17 → 8/06/17 |
Keywords
- Constrained Shortest Path Problem
- Hydro Unit Commitment Problem
- Time expanded graph representation
Fingerprint
Dive into the research topics of 'A path-based formulation for the hydro unit commitment and scheduling problem'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver