Skip to main navigation Skip to search Skip to main content

Delay Analysis of a Mempool-Based Blockchain Protocol under Asymptotic Hypothesis

  • Khouloud Hwerbi
  • , Ichrak Amdouni
  • , Cedric Adjih
  • , Philippe Jacquet
  • , Leila Azouz Saidane
  • , Anis Laouiti
  • University of Manouba
  • Telecom Sudparis
  • INRIA Institut National de Recherche en Informatique et en Automatique

Research output: Chapter in Book/Report/Conference proceedingConference contributionpeer-review

Abstract

Delays in blockchain networks are mainly related to consensus protocols. Among these protocols, we focus on a specific family of protocols, where the mempool's role in the consensus mechanism is explicitly examined. A mempool is a temporary storage area for transactions waiting to be included in a block. This study investigates the round duration of two mempool-based protocols: one requiring a single quorum of messages and another demanding two. We perform the delay analysis with two approaches. First, we elaborate on a Markov chain to determine the distribution of the round durations. Second, we establish an analytical model of message delays while assuming an exponential distribution of message propagation delays. Finally, asymptotic analysis is conducted to estimate the time of quorum formation. We end the paper by comparing the simulation results with the theoretical ones. Results show that both results are very close. This research offers valuable insights into the performance characteristics of mempool-based consensus protocols, aiding in the design and optimization of blockchain systems.

Original languageEnglish
Title of host publication2024 13th IFIP/IEEE International Conference on Performance Evaluation and Modeling in Wired and Wireless Networks, PEMWN 2024
PublisherInstitute of Electrical and Electronics Engineers Inc.
ISBN (Electronic)9783903176690
DOIs
Publication statusPublished - 1 Jan 2024
Event13th IFIP/IEEE International Conference on Performance Evaluation and Modeling in Wired and Wireless Networks, PEMWN 2024 - Agadir, Morocco
Duration: 25 Sept 202427 Sept 2024

Publication series

Name2024 13th IFIP/IEEE International Conference on Performance Evaluation and Modeling in Wired and Wireless Networks, PEMWN 2024

Conference

Conference13th IFIP/IEEE International Conference on Performance Evaluation and Modeling in Wired and Wireless Networks, PEMWN 2024
Country/TerritoryMorocco
CityAgadir
Period25/09/2427/09/24

Keywords

  • Asymptotic hypothesis
  • Blockchain
  • Delay Analysis
  • Exponential Dis-Tribution
  • Markov Chain
  • Performance Eval-uation

Fingerprint

Dive into the research topics of 'Delay Analysis of a Mempool-Based Blockchain Protocol under Asymptotic Hypothesis'. Together they form a unique fingerprint.

Cite this