T1 - A mathematical framework for delay analysis in single source networks
AU - Parmentier, Axel
AU - Samaranayake, Samitha
AU - Xuan, Yiguang
AU - Bayen, Alexandre
N1 - Publisher Copyright:
© 2015 American Automatic Control Council.
PY - 2015/7/28
Y1 - 2015/7/28
N2 - This article presents a mathematical framework for modeling heterogeneous flow networks with a single source and multiple sinks. The traffic is differentiated by its destination (i.e. Lagrangian flow) and different flow groups are assumed to satisfy the first-in-first-out (FIFO) condition at each junction. We show that our model leads to a well-posed problem for computing the dynamics of the system and prove that the solution is unique through a mathematical derivation of the model properties. The framework is then used to analytically prescribe the delays at each junction of the network and across any sub-path, which is one of the contributions of the article. This is a critical requirement when solving control and optimization problems over the network, such as system optimal network routing and solving for equilibrium behavior. In fact, the framework provides analytical expressions for the delay at any node or sub-path as a function of the inflow at any upstream node. Furthermore, the model can be solved numerically using a very simple and efficient feed forward algorithm. We demonstrate the versatility of the framework by applying it to a diverge junction with complex junction dynamics.
AB - This article presents a mathematical framework for modeling heterogeneous flow networks with a single source and multiple sinks. The traffic is differentiated by its destination (i.e. Lagrangian flow) and different flow groups are assumed to satisfy the first-in-first-out (FIFO) condition at each junction. We show that our model leads to a well-posed problem for computing the dynamics of the system and prove that the solution is unique through a mathematical derivation of the model properties. The framework is then used to analytically prescribe the delays at each junction of the network and across any sub-path, which is one of the contributions of the article. This is a critical requirement when solving control and optimization problems over the network, such as system optimal network routing and solving for equilibrium behavior. In fact, the framework provides analytical expressions for the delay at any node or sub-path as a function of the inflow at any upstream node. Furthermore, the model can be solved numerically using a very simple and efficient feed forward algorithm. We demonstrate the versatility of the framework by applying it to a diverge junction with complex junction dynamics.
UR - https://www.scopus.com/pages/publications/84940932789
U2 - 10.1109/ACC.2015.7172054
DO - 10.1109/ACC.2015.7172054
M3 - Conference contribution
AN - SCOPUS:84940932789
T3 - Proceedings of the American Control Conference
SP - 4603
EP - 4609
BT - ACC 2015 - 2015 American Control Conference
PB - Institute of Electrical and Electronics Engineers Inc.
T2 - 2015 American Control Conference, ACC 2015
Y2 - 1 July 2015 through 3 July 2015
ER -