Résumé
In this paper, we study a single-reservoir Hydro Unit Commitment Problem in a deterministic price-taker context, where production is assumed to be generated through discrete operational points. Under some hypotheses, we present a time expanded graph representation for the problem, where, at each time step, nodes correspond to the discrete operational points, and arcs refer to possible state changes. Based on the graph representation, we show that our problem reduces to a Constrained Shortest Path Problem.
| langue originale | Anglais |
|---|---|
| Pages | 139-142 |
| Nombre de pages | 4 |
| état | Publié - 1 janv. 2020 |
| Evénement | 15th Cologne-Twente Workshop on Graphs and Combinatorial Optimization, CTW 2017 - Cologne, Allemagne Durée: 6 juin 2017 → 8 juin 2017 |
Une conférence
| Une conférence | 15th Cologne-Twente Workshop on Graphs and Combinatorial Optimization, CTW 2017 |
|---|---|
| Pays/Territoire | Allemagne |
| La ville | Cologne |
| période | 6/06/17 → 8/06/17 |
Empreinte digitale
Examiner les sujets de recherche de « A path-based formulation for the hydro unit commitment and scheduling problem ». Ensemble, ils forment une empreinte digitale unique.Contient cette citation
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver