TY - JOUR
T1 - Commissioning of the camera of the first Large Size Telescope of the Cherenkov Telescope Array
AU - the CTA LST project
AU - Saito, T.
AU - Delgado, C.
AU - Blanch, O.
AU - Artero, M.
AU - Barrio, J. A.
AU - Cassol, F.
AU - Diaz, C.
AU - Hadasch, D.
AU - Hoffmann, D.
AU - Houles, J.
AU - Inome, Y.
AU - Iori, M.
AU - Jouvin, L.
AU - Kerszberg, D.
AU - Kobayashi, Y.
AU - Kubo, H.
AU - Martinez, G.
AU - Mazin, D.
AU - Moretti, E.
AU - Nakamori, T.
AU - Nozaki, S.
AU - Oka, T.
AU - Okumura, A.
AU - Palatiello, M.
AU - Polo, M.
AU - Prast, J.
AU - Sakurai, S.
AU - Sunada, Y.
AU - Takahashi, M.
AU - Takeishi, R.
AU - Tejedor, L. A.
AU - Yamamoto, T.
AU - Yoshida, T.
AU - Abe, H.
AU - Aguasca, A.
AU - Agudo, I.
AU - Antonelli, L. A.
AU - Aramo, C.
AU - Armstrong, T.
AU - Asano, K.
AU - Ashkar, H.
AU - Aubert, P.
AU - Baktash, A.
AU - Bamba, A.
AU - Baquero Larriva, A.
AU - Baroncelli, L.
AU - Barres de Almeida, U.
AU - Batkovic, I.
AU - Becerra González, J.
AU - Bernardos, M. I.
N1 - Publisher Copyright:
© 2022 Sissa Medialab Srl. All rights reserved.
PY - 2022/3/18
Y1 - 2022/3/18
N2 - The first Large Size Telescope (LST-1) of the Cherenkov Telescope Array has been operational since October 2018 at La Palma, Spain. We report on the results obtained during the camera commissioning. The noise level of the readout is determined as a 0.2 p.e. level. The gain of PMTs are well equalized within 2% variation, using the calibration flash system. The effect of the night sky background on the signal readout noise as well as the PMT gain estimation are also well evaluated. Trigger thresholds are optimized for the lowest possible gamma-ray energy threshold and the trigger distribution synchronization has been achieved within 1 ns precision. Automatic rate control realizes the stable observation with 1.5% rate variation over 3 hours. The performance of the novel DAQ system demonstrates a less than 10% dead time for 15 kHz trigger rate even with sophisticated online data correction.
AB - The first Large Size Telescope (LST-1) of the Cherenkov Telescope Array has been operational since October 2018 at La Palma, Spain. We report on the results obtained during the camera commissioning. The noise level of the readout is determined as a 0.2 p.e. level. The gain of PMTs are well equalized within 2% variation, using the calibration flash system. The effect of the night sky background on the signal readout noise as well as the PMT gain estimation are also well evaluated. Trigger thresholds are optimized for the lowest possible gamma-ray energy threshold and the trigger distribution synchronization has been achieved within 1 ns precision. Automatic rate control realizes the stable observation with 1.5% rate variation over 3 hours. The performance of the novel DAQ system demonstrates a less than 10% dead time for 15 kHz trigger rate even with sophisticated online data correction.
UR - https://www.scopus.com/pages/publications/85144623944
M3 - Conference article
AN - SCOPUS:85144623944
SN - 1824-8039
VL - 395
JO - Proceedings of Science
JF - Proceedings of Science
M1 - 718
T2 - 37th International Cosmic Ray Conference, ICRC 2021
Y2 - 12 July 2021 through 23 July 2021
ER -