TY - GEN
T1 - Delay Analysis of a Mempool-Based Blockchain Protocol under Asymptotic Hypothesis
AU - Hwerbi, Khouloud
AU - Amdouni, Ichrak
AU - Adjih, Cedric
AU - Jacquet, Philippe
AU - Saidane, Leila Azouz
AU - Laouiti, Anis
N1 - Publisher Copyright:
© 2024 IFIP.
PY - 2024/1/1
Y1 - 2024/1/1
N2 - Delays in blockchain networks are mainly related to consensus protocols. Among these protocols, we focus on a specific family of protocols, where the mempool's role in the consensus mechanism is explicitly examined. A mempool is a temporary storage area for transactions waiting to be included in a block. This study investigates the round duration of two mempool-based protocols: one requiring a single quorum of messages and another demanding two. We perform the delay analysis with two approaches. First, we elaborate on a Markov chain to determine the distribution of the round durations. Second, we establish an analytical model of message delays while assuming an exponential distribution of message propagation delays. Finally, asymptotic analysis is conducted to estimate the time of quorum formation. We end the paper by comparing the simulation results with the theoretical ones. Results show that both results are very close. This research offers valuable insights into the performance characteristics of mempool-based consensus protocols, aiding in the design and optimization of blockchain systems.
AB - Delays in blockchain networks are mainly related to consensus protocols. Among these protocols, we focus on a specific family of protocols, where the mempool's role in the consensus mechanism is explicitly examined. A mempool is a temporary storage area for transactions waiting to be included in a block. This study investigates the round duration of two mempool-based protocols: one requiring a single quorum of messages and another demanding two. We perform the delay analysis with two approaches. First, we elaborate on a Markov chain to determine the distribution of the round durations. Second, we establish an analytical model of message delays while assuming an exponential distribution of message propagation delays. Finally, asymptotic analysis is conducted to estimate the time of quorum formation. We end the paper by comparing the simulation results with the theoretical ones. Results show that both results are very close. This research offers valuable insights into the performance characteristics of mempool-based consensus protocols, aiding in the design and optimization of blockchain systems.
KW - Asymptotic hypothesis
KW - Blockchain
KW - Delay Analysis
KW - Exponential Dis-Tribution
KW - Markov Chain
KW - Performance Eval-uation
UR - https://www.scopus.com/pages/publications/85210855430
U2 - 10.23919/PEMWN62766.2024.10737565
DO - 10.23919/PEMWN62766.2024.10737565
M3 - Conference contribution
AN - SCOPUS:85210855430
T3 - 2024 13th IFIP/IEEE International Conference on Performance Evaluation and Modeling in Wired and Wireless Networks, PEMWN 2024
BT - 2024 13th IFIP/IEEE International Conference on Performance Evaluation and Modeling in Wired and Wireless Networks, PEMWN 2024
PB - Institute of Electrical and Electronics Engineers Inc.
T2 - 13th IFIP/IEEE International Conference on Performance Evaluation and Modeling in Wired and Wireless Networks, PEMWN 2024
Y2 - 25 September 2024 through 27 September 2024
ER -