Passer à la navigation principale Passer à la recherche Passer au contenu principal

Design and testing of a load current multiplier on zebra facility

  • A. S. Chuvatin
  • , V. L. Kantsyrev
  • , L. I. Rudakovc
  • , M. E. Cuneo
  • , A. L. Astanovitskiy
  • , R. Presura
  • , A. S. Safronova
  • , A. A. Esaulov
  • , W. Cline
  • , K. M. Williamson
  • , I. Shrestha
  • , M. F. Yilmaz
  • , G. C. Osborne
  • , M. Weller
  • , T. Jarrett
  • , B. LeGalloudec
  • , V. Nalajala
  • , T. D. Pointon
  • , K. A. Mikkelson
  • University of Nevada, Reno
  • Icarus Research, Inc.
  • Sandia National Laboratories, New Mexico

Résultats de recherche: Contribution à un journalArticle de conférenceRevue par des pairs

Résumé

The Load Current Multiplier concept (LCM) was validated for the first time on a high-voltage nanosecond pulse-power generator. The designed new device allowed to increase the load current from the nominal 0.8-0.9 MA up to 1.6 MA in static loads with constant inductance and up to 1.4 MA in a planar wire-array plasma loads. These results were achieved without modifying the generator energetic or architecture. LCM allowed both the load magnetic energy increase and the increase of soft X-ray radiation from z-pinch plasmas.

langue originaleAnglais
Pages (de - à)253-258
Nombre de pages6
journalAIP Conference Proceedings
Volume1088
Les DOIs
étatPublié - 13 avr. 2009
Evénement7th International Conference on Dense Z-Pinches - Alexandria, VA, États-Unis
Durée: 12 août 200821 août 2008

Empreinte digitale

Examiner les sujets de recherche de « Design and testing of a load current multiplier on zebra facility ». Ensemble, ils forment une empreinte digitale unique.

Contient cette citation