Incefa-scale (increasing safety in npps by covering gaps in environmental fatigue assessment-Focusing on gaps between laboratory data and component-scale)

  • Kevin Mottershead
  • , Roman Cicero
  • , Alec McLennan
  • , Stephan Courtin
  • , Caitlin Huotilainen
  • , Sergio Cicero
  • Jacobs Engineering Group Inc, UK
  • Inesco Ingenieros
  • EDF R&D3
  • VTT Technical Research Centre of Finland Ltd
  • CSIC-Univ. Cantabria

Résultats de recherche: Le chapitre dans un livre, un rapport, une anthologie ou une collection › Contribution à une conférence › Revue par des pairs

1 Citation (Scopus)

Résumé

INCEFA-SCALE is a five year project supported by the European Commission HORIZON2020 programme. It is the successor to the INCEFA-PLUS programme that ran from 2015 to 2020. INCEFA-SCALE kicked off in October 2020. The objective is to continue work, advancing the ability to predict lifetimes of Nuclear Plant components when subjected to Environmental Assisted Fatigue loading (EAF). It has been generally observed by nuclear plant operators that the number of failure events attributable to EAF is fewer than predicted by the current assessment methodologies. It is internationally recognised that a possible contributor to this discrepancy is the transferability of laboratory-scale tests to real nuclear components. EPRI, in the USA, is leading a series of component-scale environmental fatigue tests that are expected to advance data availability significantly; however, the ability to address transferability of laboratory-scale tests to real component geometries and loadings will still be constrained by limited test data. This is the knowledge gap addressed by INCEFA-SCALE. The project strategy will be (1) the development of comprehensive mechanistic understanding developed through detailed examination of test specimens and MatDB data mining, and (2) testing focussed on particular aspects of component-scale cyclic loading. The project will initially survey and understand the vast amount of test data within JRC's MatDB database (from the predecessor INCEFAPLUS project, and from other external sources such as USNRC, EPRI, MHI and the AdFaM project). The experimental programmewill be specified in the first year and run for three years. Finally, the project will deliver guidance on the use of laboratory-scale data for component-scale applications. This paper will report progress in agreeing data gaps, mechanistic understanding needs, and testing requirements.

langue originaleAnglais
titreCodes and Standards
EditeurAmerican Society of Mechanical Engineers (ASME)
ISBN (Electronique)9780791885314
Les DOIs
étatPublié - 1 janv. 2021
Modification externeOui
EvénementASME 2021 Pressure Vessels and Piping Conference, PVP 2021 - Virtual, Online
Durée: 13 juil. 2021 → 15 juil. 2021

Série de publications

NomAmerican Society of Mechanical Engineers, Pressure Vessels and Piping Division (Publication) PVP
Volume1
ISSN (imprimé)0277-027X

Une conférence

Une conférenceASME 2021 Pressure Vessels and Piping Conference, PVP 2021
La villeVirtual, Online
période13/07/21 → 15/07/21

Empreinte digitale

Examiner les sujets de recherche de « Incefa-scale (increasing safety in npps by covering gaps in environmental fatigue assessment-Focusing on gaps between laboratory data and component-scale) ». Ensemble, ils forment une empreinte digitale unique.

Contient cette citation